GE Monogram GEZV925SLSS Manual de Instalação

Consulte online ou descarregue Manual de Instalação para Exaustores GE Monogram GEZV925SLSS. GE Monogram GEZV925SLSS Installation Instructions Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - Instructions

InstallationInstructions36″ Island Chimney Vent HoodZV92549-8032905-06 JR

Página 2 - 36″ Hood

9Plan the Location of the Hood and Ductwork• Use a plumb bob to check the location. Thecountertop/cooktop below the hood must be centered with the hoo

Página 3

10Top view – ceiling joists run perpendicular to front of hoodTop view – ceiling joists at angle to front of hoodInstallation PreparationCONSTRUCT CEI

Página 4 - Design Information

Ceiling Joist10-3/42x 4 Min.Cross FramingHeightAdjustmentScrew Holes7-1/16"11CONSTRUCT CEILING SUPPORT CONTINUEDInstallation PreparationDuctwork

Página 5 - WARNING:The improper

12• Align the template with the marks on the ceilingand tape in place.– Be sure the template is oriented correctlywith the front of the hood.• Use a p

Página 6

13Installation InstructionsSTEP 3 CUT DUCT TO LENGTH FORVENTED INSTALLATION• Measure from house duct toexhaust opening.• Cut the 8″ duct length to si

Página 7

14STEP 7 CONNECT CABLES• Join the two cable connectors at the front of thehood. Secure the cables behind the retainer clip.RetainerclipInstallation I

Página 8 - PRUDENCE : LEVEZ LA HOTTE À

15Installation InstructionsSTEP 8 CONNECT ELECTRICALVerify that power is turned off at the source.WARNING:If house wiring is not 2-wire with a ground

Página 9

16Installation InstructionsSTEP 9 PREPARE THE DUCT COVERS• Remove the plastic protective covering on all duct pieces.• Install 3 cage nuts on each in

Página 10 - Installation Preparation

17Installation InstructionsSTEP 11 INSTALL LOWER DUCT COVER• Place rear duct cover onto the hood.• Place front duct cover onto the hood.• Secure the

Página 11

18Installation Instructions• Align the template with the marks on the ceilingand tape in place.– Be sure the template is oriented correctlywith the fr

Página 12

49-80406Printed in Italy 04-06 JR36″ Hood Template8-1/2″ Dia.Cut a 1″ Dia.Wire AccessHoleCut a 1″ Dia.Wire AccessHoleDrill 3/16″ Pilot HolesApprox.

Página 13 - Installation Instructions

19Installation InstructionsSTEP 4 INSTALL UPPER SUPPORT FRAME• Raise the upper supporttoward the ceiling.• Thread the house wiringthrough one of the

Página 14

20STEP 5 INSTALL LOWER STRUCTURETO UPPER STRUCTURE• Slide lower frame into the upper frame. Matchthe marked alignmentholes.• Secure the upper andlowe

Página 15 - AVERTISSEMENT :Il faut

21Installation InstructionsINSTALLATION—RECIRCULATINGSTEP 9 CONNECT CABLES• Join the two cable connectors at the front of thehood. Secure the cables

Página 16 - AVERTISSEMENT :

22Installation InstructionsINSTALLATION—RECIRCULATINGSTEP 10 CONNECT ELECTRICALVerify that power is turned off at the source.WARNING:If house wiring

Página 17

23Installation InstructionsINSTALLATION—RECIRCULATINGSTEP 11 PREPARE THE DUCT COVERS• Remove the plastic protective covering on all ductpieces.• Inst

Página 18

24Installation InstructionsINSTALLATION—RECIRCULATINGSTEP 13 INSTALL LOWER DUCT COVER• Place rear duct cover onto the hood.• Place front duct cover o

Página 19 - INSTALLATION—RECIRCULATING

25Installation InstructionsINSTALLATION—RECIRCULATINGSTEP 15 INSTALL FILTERSIMPORTANT: Check to be sure that the mainON/OFF switch next to the motor

Página 20

26Notes

Página 21

27Notes

Página 22

Note: While performing installations described in this book,safety glasses or goggles should be worn.For Monogram®local service in your area, call 1.8

Página 23

2Installation InstructionsWARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY, OBSERVE THE FOLLOWING:A. Use this unit only in the manner i

Página 24

3Design InformationPRODUCT DIMENSIONSCONTENTSDesign InformationProduct Dimensions ...

Página 25

Advance PlanningADVANCE PLANNINGDuctwork Planning•These vent hoods are equipped for 8″ round ductwork. •Determine the exact location of the vent hood.

Página 26

5Advance PlanningTotalEquivalent Quantity EquivalentDuct Piece Dimensions Length* Used LengthRound, 1 ft.straight (per footlength)3-1/4″ x 12″ 1 ft. 3

Página 27

DETERMINE INSTALLATION HEIGHT• Decorative duct covers are provided to conceal the ductwork running to the ceiling.• This hood can be installed for rec

Página 28

7Installation PreparationTOOLS AND MATERIALS REQUIRED(NOT SUPPLIED)Pencil and tape measurePliers120V 60Hz. 15 or 20 Amp, 2-wire with ground. properlyg

Página 29 - 1.800.444.1845

Installation PreparationPARTS PROVIDEDLocate the parts packed with the hood.HARDWARE PACKAGELocate and check contents. Screws shown actual size.Air de

Comentários a estes Manuais

Sem comentários